What is RAPID Pengerang project?

The RAPID Pengerang project refinery is designed to produce gasoline and diesel that meet Euro 4 and Euro 5 fuel specifications. It also supplies feedstock for the petrochemical complex, which creates highly specialised chemicals.

How do I get a Petronas license?

To become a PETRONAS supplier, your company must meet these requirements:

  1. Locally incorporated.
  2. Registered with the Companies Commission of Malaysia (SSM) or with with relevant professional bodies.
  3. Minimum paid-up capital of RM100,000 for License.
  4. Minimum paid-up capital of RM10,000 for Registration.

What is a Petronas license?

1 Issuance of PETRONAS License is based on the Petroleum Development Act 1974 and Petroleum Regulations 1974. Based on this Act, an entity that wishes to provide goods / services to the upstream sector in the oil and gas industry in Malaysia must have a valid license.

Does Johor have oil?

Currently, independent storage capacity in the Johor region is around 3.5 million m3 compared to Singapore’s more significant 13 million m3. …

When did Rapid Pengerang start?

2014
Construction on the RAPID project commenced in 2014 and operations are expected to be officially commenced by 2019. RAPID complex aims to produce 7.7 million tonnes a year of various petrochemical products.

Is PETRONAS good oil?

Genuine petronas oil is of good quality as it keeps the vibration of the engine very low and also makes the acceleration effortless. I would recommend replacement every 7000-8000 Km as the oil looses it charector by then and performance drops.

Who owns PETRONAS Twin?

KLCC Holdings Sdn Bhd

Petronas Towers
Cost US$1.6 billion
Owner KLCC Holdings Sdn Bhd
Height
Architectural 451.9 m (1,483 ft)

What is Swec code?

The guidelines are segmented in a very detailed fashion set out in the Standardised Work and Equipment Category known as SWEC and identified by codes thereto. These categories identify and group specific work and product categories across the entire oil and gas sector.

What is Petroleum Development Act 1974?

The Petroleum Development Act (PDA) came into force on 1 October 1974. It has vested in PETRONAS “the entire ownership in, and the exclusive rights, powers, liberties and privileges of exploring, exploiting, winning and obtaining petroleum whether onshore or offshore of Malaysia”.

How do I renew my Petronas license?

To submit renewal of license or registration application. Perform this to apply for renewal of PETRONAS ROS license/registration. 1. Go to https://supplier-selfservice.petronas.com.my/ and login using supplier user ID and password.

Where are the Petronas rapid projects in Malaysia?

Malaysia’s state-owned Petronas has confirmed the award of 11 major contracts related to critical milestones in the development of its refinery and petrochemical integrated development (RAPID) complex at Pengerang in southeastern Johor, Malaysia ( OGJ Online, May 13, 2011 ).

How big is the Petronas rapid oil refinery?

At the heart of PIC is the Refinery and Petrochemical Integrated Development (RAPID) project with a 300,000 barrels-per-day (BPD) refinery and a petrochemical complex with a combined 3.609 million metric tons-per-year production capacity.

Which is part of the Petronas Pengerang integrated complex?

Pengerang Integrated Complex (PIC) forms part of Johor’s larger Pengerang Integrated Petroleum Complex (PIPC). PETRONAS’ PIC project is designed to produce premium differentiated​ petrochemicals to meet domestic demand for petroleum products.

When did Petronas break ground for Pengerang power plant?